EICR certificate
The electrical safety report required for rented property, with your certificate within 24 hours.
Landlord and property compliance across the UK
Electrical, gas and fire safety certificates, EPCs, remedial work, CCTV, floor plans and plumbing from one team across the UK, at clear standard prices.
Select any service to see exactly what is included, who needs it and what you receive, then book it online.
The electrical safety report required for rented property, with your certificate within 24 hours.
Annual landlord gas safety check and certificate.
Energy rating of your property, required to let or sell.
Fire alarm testing with a written certificate.
A written assessment of fire hazards and the actions needed.
Portable appliance testing with a record of every item.
Inspection and duration testing of your emergency lighting.
Put right the faults on a failed EICR. Send us the report for a quote.
Accurate measured floor plans for lettings, sales and planning.
Plumbing repairs and installations for your property.
Design and installation of CCTV systems for homes and businesses.
Landlords, agents and homeowners get every certificate they need from one team, with one point of contact.
EICR inspections, remedial work after a failed report, PAT testing and emergency lighting.
Annual landlord gas safety checks and CP12 certificates.
Fire alarm certificates and written fire risk assessments.
EPCs, measured floor plans, plumbing and CCTV installation.
The time landlords have to complete remedial work after an unsatisfactory EICR, unless the report sets a shorter period.
In England, landlords need a Gas Safety Certificate every 12 months, an EICR at least every 5 years and an EPC rated E or above. HMOs also need a fire risk assessment and a maintained fire alarm system.
| Certificate | How often | Our price |
|---|---|---|
| Gas Safety Certificate (CP12) | Every 12 months | £100 |
| EICR electrical safety report | At least every 5 years | From £150 |
| Energy Performance Certificate | Valid 10 years, minimum E rating | Quoted |
| Fire risk assessment (HMOs, common parts) | Reviewed regularly | £170 |
| Fire alarm certificate (HMOs, flats) | Servicing at least every 6 months | £120 |
| Emergency lighting inspection | Annual duration test | £140 |
| PAT testing (furnished lets) | Risk based | £150 |
Google reviews
See what landlords, homeowners and agents say about working with Safety Standards Ltd. on our Google Business Profile.
Your review helps other landlords and homeowners choose a certified engineer. It takes a minute.
At least every five years, or at the start of a new tenancy if your last report is older. The inspection must be carried out by a qualified person under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.
A typical domestic EICR takes between 2 and 4 hours, depending on the size of the property and the complexity of the electrical system. Studios and small flats can be quicker.
An unsatisfactory report lists C1, C2 or FI codes. You must have the remedial work carried out within 28 days to bring the installation up to standard and stay compliant. Message us and we will explain each item in plain English.
Your digital certificate is emailed within 24 hours of the inspection.
Yes. It is not a legal requirement for owner-occupiers, but an EICR reduces fire and shock risk, can be requested by insurers or mortgage lenders, and is useful when selling a home.
Gas Safety (CP12), fire safety certificates, fire risk assessments, PAT testing and emergency light inspections, plus remedial work after a failed EICR, floor plans and plumbing.
Yes. Choose Emergency or same-day booking in the booking form. It carries an additional charge of £200, shown before you confirm.
Follow the steps below. At the end you receive a job number that lets you track your job at any time.
Step 2 of 4 · Check your invoice.
Your job number is . Keep it: you use it to track your job.
Step 3 of 4 · Pay by bank transfer and upload your screenshot.
Use your job number as the payment reference. We never change our bank details by WhatsApp or email, so check the account name before you pay.
Step 2 of 4 · Your request
Enter the job number from your invoice to see where your job is up to.
An Electrical Installation Condition Report (EICR) is a full inspection and test of the fixed electrical installation in a property. It shows whether the wiring and consumer unit are safe to keep using and lists anything that needs attention.
Private landlords in England must have an EICR at least every five years, and before a new tenancy if the last report is older. Homeowners often need one when buying or selling, or for insurance or a mortgage.
A digital EICR certificate by email within 24 hours of the inspection, marked satisfactory or unsatisfactory, with every observation coded.
Time on site: A typical domestic inspection takes 2 to 4 hours. Power to individual circuits is switched off briefly during testing.
A C1, C2 or FI makes the report unsatisfactory. Local authorities can fine landlords up to £30,000 for non-compliance in England.
A landlord gas safety check confirms that every gas appliance, pipe and flue in a rented property is safe. It is a legal duty every 12 months.
Every landlord who lets a property with gas appliances. The check must be carried out by a Gas Safe registered engineer and a copy given to tenants.
A Gas Safety Record (CP12) certificate, issued promptly after the visit.
Time on site: Usually about an hour for a typical home, depending on the number of appliances.
We test your fire alarm system and certify that it works, so you can show landlords, insurers and enforcement officers that it has been checked.
Landlords, managing agents and businesses that need to show their fire alarm system is working, including HMOs and blocks of flats.
A written fire alarm test certificate, with a note of any defects found.
Time on site: Depends on the size of the system. We ask for the floor area when you book.
A fire risk assessment is a structured review of a building's fire hazards, the people at risk and the precautions in place. It is a legal duty for most non-domestic premises and for the shared areas of blocks of flats and HMOs in England and Wales.
The responsible person for commercial premises, HMOs and the common parts of residential blocks.
A written fire risk assessment with a prioritised action plan.
Time on site: Depends on the size and layout of the property, which is why we ask for the floor area when you book.
Portable appliance testing (PAT) checks that plug-in electrical equipment is safe to use. The standard price covers up to 10 appliances.
Landlords of furnished lets, offices, shops and any workplace with portable electrical equipment.
A PAT test record listing every appliance tested, with labels fitted to each item.
Time on site: A short visit for up to 10 appliances.
Emergency lighting guides people to safety if the power fails. We inspect and test every fitting to make sure it works for its full rated duration.
Flats, HMOs, offices and commercial buildings whose escape routes rely on emergency lighting.
An emergency lighting test certificate with a record of every fitting tested.
Time on site: Includes a timed duration test, so the visit depends on the number of fittings.
A clear, scaled floor plan of your property, measured on site.
Landlords, agents, sellers and anyone who needs a reliable plan of a property.
A digital floor plan of the property.
Time on site: Depends on the size of the property. We confirm when we reply with your price.
Plumbing repairs, installations and maintenance for homes and rental properties.
Homeowners, landlords and agents who need plumbing work done at a property.
A clear price once we have reviewed your request, then the work carried out at the property.
Time on site: Depends on the job. We confirm when we reply with your price.
If your EICR is unsatisfactory, the faults must be put right. We review your report, quote for the work, and carry it out so your installation can be made safe.
Landlords and homeowners whose EICR came back unsatisfactory.
A clear quote after we check your report, then written confirmation when the work is done.
Time on site: Remedial work must be completed within 28 days of the report, or sooner if the report says so.