Safety StandardsLimited

Electrical remedial work after a failed EICR

Send us your unsatisfactory EICR. We check every observation, reply within a few hours with a clear quotation, then carry out the work so you stay compliant.

How it works

  1. Send us your failed EICR with your name, number and the property address. A PDF or clear photos are fine.
  2. We review every item and reply within a few hours with a clear, itemised quotation.
  3. We book and carry out the work once you agree the quote.
  4. You receive written confirmation and the correct certification for the work, ready to send to tenants and the local authority.

Submit your failed EICR

Common remedial work

  • Consumer unit (fuse board) replacement, including a non-combustible enclosure where required
  • Adding RCD protection to socket and lighting circuits
  • Earthing and main protective bonding to gas and water services
  • Replacing damaged, loose or overheating sockets, switches and fittings
  • Correcting unsafe DIY wiring and missing covers
  • Further investigation of circuits marked FI
  • Smoke and heat alarms where required

The 28-day deadline

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, landlords must complete remedial work or further investigation within 28 days of the inspection, or within the shorter period stated in the report. They must then give written confirmation of the completed work to each tenant and to the local authority within 28 days of completion.

Local authorities can arrange the work themselves and recover the cost, and can impose financial penalties of up to £30,000.

Not sure what your report means? Read EICR codes explained and what to do after a failed EICR.

Frequently asked questions

How much does EICR remedial work cost?

It depends on the items on your report. Send us the failed EICR and we reply within a few hours with an itemised quotation.

How long do I have to fix a failed EICR?

Landlords in England must complete remedial work within 28 days of the inspection, or within a shorter period if the report specifies.

Do I need a new EICR after remedial work?

Not usually. The electrician who carries out the work provides written confirmation and the appropriate certificate, such as a Minor Works Certificate or Electrical Installation Certificate. Together with the original report, this shows the installation now meets the standard.

Can a different electrician do the remedial work?

Yes. Any qualified and competent electrician can carry out remedial work, whoever did the original inspection.

Last reviewed: By the Safety Standards Ltd. compliance team

Questions?

Talk to our team on WhatsApp or by phone. We reply quickly.

WhatsApp +44 7938 402064Book online

Send us your failed EICR

Upload your report and we reply within a few hours with a clear quotation for the remedial work.

WhatsApp